on AGRIPOWER FRANCE SA (EPA:ALAGP)
Agripower finalizes participation in a methanization project in the Meuse
Agripower France has finalized its acquisition of a 40% stake in a Brownfield project located in the Meuse region. This project aims to transform an existing methanization unit into a facility capable of injecting biomethane. Currently operating as a cogeneration unit, it will produce an injection capacity of 200 Nm³/h starting in 2027. This investment amounts to €4.8 million, including €3.5 million for construction work. Agripower, through its subsidiary, will hold 60% of the voting rights for 15 years. Construction is scheduled to begin in the summer of 2026, with a connection to the GRDF gas network.
R. E.
Copyright © 2026 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all AGRIPOWER FRANCE SA news