on Azarga Metals Corp. (CVE:AZR)
Azarga Metals Concludes Initial Drill Program at Marg Project
Azarga Metals Corp. has completed its first diamond drill program at the Marg Project, a copper-rich Volcanogenic Massive Sulphide deposit in the Keno Hill mining district, Yukon. The program involved nearly 2,500 meters of drilling across six holes, focusing on down-plunge extensions of previously intersected sulphide mineralization. The mineralized footprint remains open in several directions, indicating further potential for exploration.
The company's CEO, Gordon Tainton, expressed satisfaction with the team's efforts. Despite awaiting assay results, visible sulphide mineralization has been found encouraging. A total of 350 samples were sent to ALS laboratories for analysis.
Future plans include integrating assay data into the geological model and preparing for a phase 2 drill program in 2027. The Marg Project, with indicated resources of 4.3 Mt grading 2.9% CuEq and inferred resources of 10.0 Mt grading 2.3% CuEq, offers significant exploration potential in a well-supported infrastructure area.
R. E.
Copyright © 2026 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all Azarga Metals Corp. news