BRIEF

on Eurobattery Minerals AB

Eurobattery Minerals Unveils Promising Results from San Juan Tungsten Project

Eurobattery Minerals has announced successful outcomes from its metallurgical process design testwork at the San Juan tungsten project in Ourense, Spain. Conducted by SLR Consulting, the tests revealed a 63.1% WO₃ concentrate grade using a gravity-based circuit, with no flotation or chemical reagents involved.

The program demonstrated a 49.9% tungsten recovery rate, utilizing conventional equipment like hydrocyclones and spirals. This approach ensures a simpler and environmentally friendly processing plant, aligning with Eurobattery's goals of reducing operational costs and environmental impact.

With the test's positive results, the company is poised to advance detailed engineering and commence plant construction by 2027. These developments align with Eurobattery's mission to support Europe's sustainability transition through responsibly mined minerals.

R. H.

Copyright © 2026 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.

Click here to consult the press release on which this article is based

See all Eurobattery Minerals AB news