BRIEF

on Gold Port Corporation (CVE:GPO)

Gold Port Corporation Initiates Groete Project Access Road Construction

Gold Port Corporation has announced the start of construction for an access road to the Groete Gold Copper Project. The road will stretch 13 kilometers, beginning at Manaka Road, and will include multiple all-weather bridges. This project is a critical step in the upcoming drilling program. Currently, planning and logistics have been initiated with heavy equipment transported to the site by barge.

Located strategically 64 kilometers from Georgetown, Guyana, and near the Essequibo River, the project aims to benefit from this major transportation route. President Adrian F.C. Hobkirk emphasized the importance of this development in advancing the drilling operations, supported by recent management changes.

R. E.

Copyright © 2026 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.

Click here to consult the press release on which this article is based

See all Gold Port Corporation news