BRIEF

on Mobimo Holding AG (ETR:M1H)

Green light for the Torfmatt project in Wangen-Brüttisellen

Mobimo Holding AG's Torfmatt project has reached a crucial milestone. The Wangen-Brüttisellen municipal assembly approved the development plan almost unanimously on March 18, 2026. This mixed-use district will be built on the former ERNI site, between Brüttisellen and Dietlikon, in the canton of Zurich. This 16,000 m² area, currently mostly brownfield, will be transformed into a vibrant neighborhood with approximately 300 apartments and 5,000 m² of retail space.

Designed by KCAP and Studio Vulkan, the project comprises eight buildings with distinctive roofs and a central green space. Its construction will take place in three phases, with the first phase beginning in the fall of 2028 and ending in the spring of 2031.

R. E.

Copyright © 2026 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.

Click here to consult the press release on which this article is based

See all Mobimo Holding AG news