on Allterco JSCo (isin : BG1100003166)
Shelly Group Expands Production to Meet Growing Demand
The Shelly Group is accelerating its production capabilities to meet increasing global demand for its IoT and smart building solutions. Based in Sofia, Bulgaria, the company is doubling its production capacity at its main Chinese manufacturing plant. Starting in the second half of 2025, capacity will rise from 800,000 to 1.5 million units monthly, aiming for two million units by 2026.
This expansion allows for a potential sales increase by over EUR 100 million annually. The associated costs will be fully covered by the Chinese contract manufacturer. Shelly Group's strategic expansion supports its goals of supplying advanced technology products worldwide and aligns with its long-term growth strategy.
R. E.
Copyright © 2025 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all Allterco JSCo news