on Snowline Gold Corp. (isin : CA83342V1040)
Snowline Gold Corp Achieves Significant Milestones in 2024
In 2024, Snowline Gold Corp, a gold exploration company, announced key achievements and activities. The company released an initial Mineral Resource Estimate (MRE) for its Valley deposit within the Rogue Project, outlining significant near-surface gold deposits. The MRE includes 4.05 Moz of gold indicated at 1.66 g/t and 3.26 Moz inferred at 1.25 g/t.
Operationally, over 35,000 meters of drilling were completed, notably increasing drilled meters at Valley by 90%. The company also expanded its Einarson Project through significant acquisitions, boosting exploration potential. Financially, Snowline raised $31.9M, leaving C$43.2M in reserves for 2025 operations, building confidence for further exploration.
Environmental and local collaborations were strengthened, earning the company the Robert E. Leckie Award for environmental stewardship. Looking ahead, Snowline plans active exploration and updates to the MRE in 2025.
R. H.
Copyright © 2025 FinanzWire, all reproduction and representation rights reserved.
Disclaimer: although drawn from the best sources, the information and analyzes disseminated by FinanzWire are provided for informational purposes only and in no way constitute an incentive to take a position on the financial markets.
Click here to consult the press release on which this article is based
See all Snowline Gold Corp. news