News
-
-
PRESS RELEASE
Aton Reports Final Results from The Abu Marawat Diamond Drill Programme, Including 39.55 G/T Gold And 161 G/T Silver Over 3.90 Metres from The JVZ Structure, And 9.63 G/T Gold And 86.5 G/T Silver Over 17.70 Metres from the CVZ
Aton Resources Inc. provides update on diamond drilling programme at Abu Marawat deposit in Egypt, revealing significant polymetallic mineralised intersections including gold, silver, copper, and zinc. CEO emphasizes progress on metallurgical and geotechnical drilling, environmental surveys, and discussions with Egyptian authorities -
-
-
-
PRESS RELEASE
Aton Reports Further High Grade Diamond Drilling Results From Abu Marawat, Including 33.86 g/t Gold and 419 g/t Silver Over 2.5 Metres From the Fin Vein, and 44.59 g/t Gold and 103 g/t Silver Over 1.6 Metres From the J Vein
Aton Resources Inc. updates investors on the results of its diamond drilling programme at Abu Marawat deposit in Egypt, revealing high-grade polymetallic mineralized intersections. CEO Tonno Vahk sees potential for multiple gold mining operations -
-
PRESS RELEASE
Aton Reports the First Results From Its Phase 3 RC Drilling Programme at the Semna Project, Including 14.33 g/t Au Over an Interval of 9 metres and 10.74 g/t Au Over 6 metres
Aton Resources Inc. provides update on Semna gold mine project's phase 3 RC drilling programme in Egypt, revealing significant high-grade mineralised intersections -
-
PRESS RELEASE
Aton Reports Further Diamond Drilling Results From Abu Marawat, Including 8.52 g/t Gold and 88.7 g/t Silver Over 15.4 Metres, and 6.06 g/t Gold and 59.6 g/t Silver Over 17.3 Metres
Aton Resources updates investors on diamond drilling results at Abu Marawat deposit in Egypt, revealing high grade mineralisation in CVZ. Ongoing exploration shows promising results