News
-
-
-
-
-
-
PRESS RELEASE
Nordex Group reaches new heights with its inhouse developed hybrid tower: The second N175/6.X has now been installed - for the first time with a hub height of 179 metres
Nordex Group installs N175/6.X turbine on a hybrid tower with record hub height of 179 metres in Santow, Germany, for enhanced energy yield. CEO José Luis Blanco shares insights -
-
-
-